Free delivery with 45 order.
Attach flush to siding.
Set your store to see local availability.
Under normal circumstances vinyl siding should not come loose if it was originally hung properly.
If rotten wood is the cause a few nails will not do the trick.
Allow for movement we cannot stress enough at ron ferris son you must allow vinyl siding to move because it typically expands and contracts 1 4 per 12 feet.
Step 1 determine the problem.
Start by making an outline on the siding where you want to position the ledger board.
Well here s what the experts do.
If you don t allow vinyl siding to move it will most likely buckle and warp under the pressure.
If this is the top of a shed roof long level horizontal line then use a long piece of metal bent to the slope of the roof slipped behind the drainage plane of the wall and left on top of the roofing material.
Remove the vinyl siding where you will be attaching.
If you want to hang something from your vinyl siding don t even think about drilling through it to attach a hook to the sheathing.
Slip flashing under siding snap a chalk line cut out the siding and tack up the ledger board.
So you ve got vinyl siding and you d like to attach something to it without causing damage.
Make sure you have enough room to install flashing above the ledger board and allow for at least a space above the decking preventing water from wicking upwards into wood siding.
This article will explain how to properly attach siding whether it is a few nails that need to be replaced or a whole wall that needs attention.
White mounting block model fmntnbh04h 8 22 8 22.
Remove whatever else you require to make the attachment.
Then slip flashing behind the siding covering the top edge of the ledger.
Run a chalk line that connects these markings along the top of the first course of siding.
Outline the back of a remodeling electrical box on the siding with a pencil and cut around the outline with a keyhole saw.
There are at least three alternative ways to do it.
Set the blade depth so you won t cut into the house sheathing below the siding.
Wood or concrete siding will have to be cut away using a circular saw.
Pull the electrical wire through the back of the box then fit it in the.
This renders the siding vulnerable to moisture and voids the warranty even if you seal the hole.
Pay close attention to the area where the top row of siding meets the soffits.
Ply gem 8 18 in.
Hold it flush against the bottom of the first course of siding at each framing stud location and use a pencil to mark the reveal height on the siding.